Enumeration
This test confirms that the device consistently powers up and is enumerated by the host device. This is done through a programmed series of power cycles and device enumerations.
Pass/Fail Criteria
- The device must correctly enumerate 100% of the time.
 
Test Stages and Configurations
| Test Stage | Test Configuration | 
|---|---|
| U6 | STC I | 
Additional Configuration
- None.
 
_242x41.jpg)