Unit Test Stages
U1 | Programming | Units are loaded with firmware and initial functional testing is performed. |
U2 | Assembly | Bare boards are assembled into their final housing. |
U3 | Sensor Alignment Testing | Sensor orientation and position relative to the lens mount is measured. |
U4 | Calibration | All required sensor calibration is performed including calibration for crosstalk, multi-tap imbalances, and fixed pattern noise. |
U5 | Final Testing | Camera specification testing is completed, testing verification is performed, and assembly information is stored. |
U6 | Label Printing | Final verification of passing test results before box labels are printed. |